Civil Engineering - Infrastructure and Buildings

  • CG.jpeg

    Cheeseman's Green case study

    The Cheeseman's Green access project involved the construction of a new access road and junction adjoining the A2070 in Ashford, Kent. The 800m long access road will...

    Download PDF
      Solihull cycle way.jpg

    North Solihull case study

    The North Solihull Strategic Cycle Network project for Solihull Metropolitan Council involved the development of 18km of cycleway, both on and off an existing...

    Download PDF
    Paragon Automotive.jpg

    Kia case study

    Working for Greatline Developments Ltd, Blackwell carried out the refurbishment and extension of an existing automotive workshop at Paragon House in Stallingborough, North East Lincolnshire...

    Download PDF
      telford-case-study.jpg

    Telford case study

    Blackwell was appointed by English Partnerships to undertake the design and construction of site remediation and infrastructure on a 35 hectare brownfield site...

    Download PDF

    poole-link-rd-case-study.jpg

    Poole Link Rd case study

    The construction of an approach road for the iconic new £37M Twin Sails Bridge in Poole Harbour to connect Hamworthy and Poole comprised of the widening and reconstruction of an existing highway....

    Download PDF
      Millfield.jpg

    Millfield case study

    The Millfield Waste Transfer Station project comprised of the design and build of all remediation, geotechnical improvement, civil infrastructure works and building...

    Download PDF