Eastern Quarry case studyThe project involved the land formation works of the former Eastern Quarry site. The scheme is part of the overall works to develop the site into one of three villages which will provide...Download PDF |
![]() |
Weetslade case studyWeetslade Colliery was a design and construct scheme for One North East involving the restoration of a former colliery site and tip to create a country park and light industrial employment zone...Download PDF |
|
![]() |
Midland Quarry case studyBlackwell has now completed the reclamation and reinforced earth wall design and construct contract for Redrow Homes at the former stone quarry. The site is a mixed use development...Download PDF |
![]() |
McLaren Production facility case studyCA Blackwell were awarded the earthworks contract to excavate and blind the footprint of the new Mclaren Production Centre in Woking...Download PDF |
|
![]() |
Markham case studyThe site is located off junction 29A of the MI, forming part of the Markham Employment Growth Zone. Consisting of two separate land areas; the first consisting predominantly of land...Download PDF |
![]() |
Hanningfield case studyThe construction of the innovative reed beds at Hanningfield Water Treatment Works was awarded to Blackwell by Essex and Suffolk Water Limited. The new reed-beds system...Download PDF |
|