Ross' Land case studyThe Ross' Land project involved the reclamation of a 14 hectare site in Aberdeen, which had former uses as a sand and gravel quarry and, more recently, as a landfill. Although only part of...Download PDF |
![]() |
Middlehaven I case studyOn the 28th of April 2014, Blackwell began work on the Middlehaven Urban Park landscaping and remediation project. Situated in the Middlehaven area of Middlesbrough, this scheme involved the construction...Download PDF |
|
![]() |
Middlehaven II case studyHaving successfully undertaken the first phase of the project to create a new urban park in Middlesbrough, Blackwell secured the second phase...Download PDF |
![]() |
Tannery and Penpoll case studyBlackwell carried out the Tannery and Penpoll remediation contract on two diagonally opposite former industrial sites. The remediation of the...Download PDF |
|
![]() |
Wobaston case studyThe I54 contract involved the reclamation of a 96 hectare site at Wobaston Road in Pendeford, near Wolverhampton, which had been earmarked for future use as a technology-based...Download PDF |
![]() |
Royal Albert Basin case studyThe Royal Albert site comprised of five separate areas, totalling approximately 100 acres of land - which had been contaminated by previous uses. The site had previously been used as a disposal site...Download PDF |
|