Remediation

  • tannery-penpoll-case-study.jpg

    Tannery and Penpoll case study

    Blackwell competively tendered for the Tannery & Penpoll remediation contract, which is a contract on two diagonally opposite former industrial sites...

    Download PDF
  • royal-albert-case-study.jpg

    Royal Albert Basin case study

    The site comprises of five separate areas totalling approximately 100 acres of land contaminated by previous uses as inter alia, a dump for gas works wastes, oil storage and distribution...

    Download PDF
  • woodside-case-study.jpg

    Woodside case study

    The 12 acre site formerly housed the Aire Vale Dyeworks from pre 1851 to the mid 1950’s. The main site location was used as a tip for the deposition of waste materials associated with the processes...

    Download PDF
  • wobaston-case-study.jpg

    Wobaston case study

    Advantage West Midlands (AWM) has assembled a 220 acre (96ha) site at Wobaston Road, Pendeford, near Wolverhampton. The ’i54’ development is earmarked as a technology-based business park...

    Download PDF
  • weetslade-case-study2.jpg

    Weetslade case study

    Weetslade Colliery was a design and construct scheme for One North East involving the restoration of a former colliery site and tip to create a country park and light industrial employment...

    Download PDF
  • adtranz-case-study.jpg

    Adtranz case study

    Blackwell secured the remediation works for Phases 1,2 and 3 following a period of detailed design development in which they worked closely with the Design Consultant and Client...

    Download PDF